Bridge across Nikolaevsky Prospekt in Krasnoyarsk
The bridge across Nikolaevsky Prospekt, which connected Studenchesky district with School No 73 and the Yudin Estate Museum, was the third aluminium pedestrian crossing to be built in Krasnoyarsk. The bridge's length is 62 m, the width is 3 m, the height is 4 m, and the total weight of the aluminium structure is around 43 tonnes. The bridge consists of two spans 19 and 43 m long. The aluminium bridge structures made of AD35T1 alloy with colourless anodising were produced at the Krasnoyarsk Metallurgical Plant (KraMZ). The bridge is fully glazed and furnished with elevators and air conditioning. The spans were assembled at the Krasnoyarsk Metallurgical Plant (KraMZ) and further separated into parts and delivered to the assembly site.
Name and location of the facility: Pedestrian bridge across the Nikolaevsky Prospekt in Krasnoyarsk. The bridge connects the Studenchesky district with School No 73 and the Yudin Estate Museum.
Facility commissioning date: October 2021
Customer: MKU Capital Construction Department of Krasnoyarsk
Design organisation: CJSC Giprotransmost
Producer of the bridge structures: Krasnoyarsk Metallurgical Plant (KraMZ)
Features: The length of the bridge is 62 m, the width is 3 m and the height is 4 m. The bridge consists of two spans 19 and 43 m long.
The first aluminium bridge in Krasnoyarsk was built for the 2019 winter Student Games
Opening: October 17, 2018
Features: the length of the span is 37 m and the width
of the pedestrian part is 3 m
Location: Partizan Zheleznyak Street near Crystal Arena, Krasnoyarsk
Aluminium bridge on the 9 Maya Street
Opening: October 2018
Features: The total length of the pedestrian crossing is 170 m, the width of the pedestrian
part is 4.5 m
Location: Pedestrian crossing near the Arena-Sever ice palace at 9 Maya Street, Krasnoyarsk
Read also: